There is a moment in every property purchase when maximum pressure meets minimum room for manoeuvre: the signing of the deposit contract (contrato de arras). The buyer has just found the home they were looking for, knows – or has been told – that there is another interested party, the seller sets a short deadline and the whole system pushes in the same direction: sign now, review later. In Madrid's prime segment the usual deposit is around 10% of the price, which in transactions of between €800,000 and €2,000,000 means committing between €80,000 and €200,000. Doing so without having read the documentation is not agility. It is deciding blind with the money already on the table.
It is worth separating from the outset two sets of documents that are confused far too often: those that must be in hand before signing the deposit contract and those that can legitimately arrive between the deposit contract and the deed. Both exist and both are reasonable. The problem is never that some documents can wait: it is treating as deferrable something that affected the price, the feasibility of the renovation or the decision to buy itself. That confusion, rather than bad faith on the seller's part, lies behind most of the later disappointments.
What follows organises the documentation by source, not by type. There are three different sources – the seller, the buyer themselves and the community's property manager – and each has a different person responsible, a different channel and, above all, a different lead time. Asking for everything on the same day is the surest way to be late with something.
This article develops as an operational protocol the layer listed in the complete guide to the documents needed to buy a home in Madrid: what to demand, from whom and how far in advance.
Before or after the deposit contract: which documents can wait and which cannot
Before getting into the list, it is worth setting the priority criterion, because not all documents have the same level of urgency. The practical rule is simple: if the content of a document could change the price you are willing to pay or your decision to buy, that document comes before the deposit contract. If it only confirms something you already know or formalises a procedure, it can wait.
The first group, the one that cannot be deferred, is short and non-negotiable. An up-to-date nota simple (Land Registry extract), because it determines who can sell and with what encumbrances. The seller's identification and legal capacity, because without them no transaction is possible. The certificate of debts to the community of owners, because any outstanding amount is inherited with the property. The latest paid IBI (property tax) receipt, for the same reason and because it unlocks the cadastral record. And the licences for the most recent renovations, especially if they were substantial, because their absence instantly changes the cost and risk estimate.
The second group can wait, provided the deadline is put in writing. The minutes of recent meetings when the property manager is slow, the full ITE (Technical Building Inspection) if the building is old and the document is lengthy, the energy performance certificate where the seller has already commissioned it, or a formal planning enquiry when the home is particularly complex. None of them is minor: it is simply that obtaining them depends on third parties with their own timetables.
The practical distinction is this: any document in the first group that is not available at the time of signing must become an explicit condition precedent within the deposit contract itself. Not a verbal commitment or a goodwill email. A clause. If the seller does not accept it, that refusal is relevant information about the transaction and should be read as such.
Group 1 – What the seller must provide
These are documents that only the seller holds and must hand over on request. Here the buyer cannot get ahead independently: they depend on the diligence of the other party, which is why they should be requested in writing and with a date, from the moment the transaction is taken seriously.
The seller's identity document and legal capacity
A seller who is a private individual proves their identity with a valid DNI or NIE, which must match exactly the owner shown in the nota simple. If they act through a representative, the notarial power of attorney must be broad enough to execute the sale – a general power of administration is not enough – and must be in force. When the seller is a company, you need the updated deeds of incorporation, registration in the Companies Register and the specific powers of whoever is going to sign.
There is a warning sign that appears more often than you might think in the luxury segment, where properties have been in the same family for decades: notarial powers of attorney lapse automatically on the death of the grantor. If the original owner has died and a relative presents an old power of attorney, that power is no longer valid. The transaction must be channelled through the heirs, with proof of their status and, if there are several, with all their signatures.
Original deed of sale or title of acquisition
The deed by which the seller acquired the property proves the chain of title and documents the price they paid at the time. Cross-checked against the nota simple, it makes it possible to verify that there are no discrepancies between the registry position and what the seller presents: floor areas that do not add up, annexes that appear or disappear, boundaries described differently.
The specific warning sign lies in acquisitions by inheritance. If the seller inherited and the division of the estate was never registered, there may be co-owners who must also appear and sign. Discovering this at the notary's office, with all the parties present, is an avoidable scene.
Latest paid IBI receipt
It proves that the property is up to date with the City Council and provides the cadastral reference, which is the key to checking for yourself that the Cadastre and the Land Registry match. It matters for a specific reason: unpaid IBI is a charge on the property that follows it, so the buyer is liable for it with the home itself, regardless of who incurred the debt.
Building licences and renovations carried out
For any renovation of a certain scale there must be a building licence or prior notification issued by Madrid City Council, together with the certificate of completion where the works required it. It is by far the document most often missing in the prime segment, and also the one that costs most when it is missing.
A renovation carried out without a licence is not just a legal problem. It is a sign that nobody with technical responsibility has verified that the work complies with regulations. In buildings with planning protection – very common in the Barrio de Salamanca, Almagro, Centro or Chamberí – unlicensed work on listed elements can oblige the new owner to restore the original situation at their own expense. And the community of owners retains its own power to demand the legalisation of works that have affected communal elements or the appearance of the building. An architect who reads the renovation licences – or notes their absence – revises their estimate of capex and legal risk on the spot. Signing a deposit contract without having seen them is precisely one of the most common mistakes when buying a high-end home.
Energy performance certificate
It is mandatory for any transfer, and the seller must have it even before putting the home on the market, not at the time of the deed. If it does not exist on the date of the deposit contract, that is a failure on the seller's part, not a matter for the buyer to resolve or a task to take on to speed things up. It is also worth checking the date of issue: it is valid for ten years, and in properties that have not changed hands for a long time it is common to find it has expired.
Property manager's certificate confirming payments are up to date
The community's property manager issues a certificate stating that the home has no outstanding debts. This specific document – not a statement from the seller, nor an email, nor a loose receipt – is what releases the buyer from liability for charges from the years prior to the transfer. It must be recent, no more than thirty days old, and signed by the property manager or the president of the community. Although the seller provides it, the document originates with the community, and that origin explains why it takes time.
Group 2 – What the buyer obtains directly
This group differs from the other two in one decisive respect: these are public-source documents that the buyer obtains independently, without the seller's authorisation or involvement. Relying on the other party to obtain them introduces delay and filtering where there need be none. They cost little, arrive quickly and should be the first on the table.
Up-to-date nota simple
It is requested directly from the Land Registry or through the registrars' portal, without any involvement from the seller. It must be recent – seven to ten days before signing at most – because it reflects the registry position at the moment it is issued, not a history: a nota from three months ago proves nothing about today's encumbrances.
For a field-by-field reading – ownership, regime, mortgages with outstanding amounts, attachments, liens, easements and provisional entries – there is a dedicated article on how to interpret the nota simple and the encumbrances that appear in it. Here it is enough to bear in mind the role it plays in the protocol: it is the document that opens everything else and the only one no buyer should delegate.
Cadastral record and cadastral reference value
With the cadastral reference taken from the IBI receipt, you can access the Cadastre's online portal. The record makes it possible to compare three floor areas that do not always match: the cadastral area, the registered area and the actual measured area. Discrepancies between them are common in older buildings in central Madrid and are not always a problem, but they should be identified before negotiating the price per square metre, not afterwards.
The cadastral reference value deserves particular attention because it sets the minimum tax base for ITP (property transfer tax). In prime areas the real price almost always exceeds that value and there is no surprise, but with unique properties without clear comparables, or estates with encumbrances that depress the price, the opposite may happen, and the tax is then calculated on the reference value. It is a figure you need to know before agreeing the price, not when paying the tax.
Planning enquiry
Madrid City Council publishes the planning record for each property on its online portal: the building's level of protection, building capacity and permitted uses. In the prime areas of the centre – Salamanca, Chamberí, Retiro, Centro – much of the building stock has some level of protection that determines which renovations are possible and which will never get beyond the idea stage.
For a buyer who arrives with a renovation project in mind, this enquiry is as urgent as the nota simple and should be made before the deposit contract. It is no substitute for a formal planning enquiry for major works, but it does provide enough to detect in time a restriction that would change the purchase decision. It is also worth understanding that this documentary check and the technical checklist for verifying the property are parallel layers, not consecutive ones: they are applied at the same time and on the same timetable.
Group 3 – What the community's property manager must provide
This is the group most often requested too late. The community's property manager has no obligation to respond within twenty-four hours: it depends on their workload, the availability of the president and the meeting calendar. Obtaining a certificate or a history of minutes can take between five and fifteen working days. Requesting them on the same day you want to sign the deposit contract is a planning error, not a problem with the property manager.
Minutes of recent meetings (minimum three years)
The minutes are the X-ray of the building that no seller will volunteer to summarise. They reveal approved or ongoing works, special levies under way, disputes between neighbours and open litigation, changes to building services and resolutions on the use of communal areas that may directly affect the enjoyment of the home.
What to look for most carefully are special levy resolutions. The rule that surprises many buyers is that payment of each instalment falls to whoever is the owner when that instalment is charged, not to whoever was the owner when the levy was approved. If a resolution was voted two meetings ago and the first instalment falls due after the deed, the buyer pays it. In buildings in central Madrid undergoing refurbishment of the façade, roof or installations, that amount can be considerable, and it appears in the minutes long before it appears in any other document.
Certificate of outstanding debts to the community
This is different from the up-to-date payment certificate provided by the seller: here the property manager is asked for a breakdown of unpaid bills and invoiced items pending collection. It is the document the notary will require at the time of the deed, but requesting it before the deposit contract has an advantage that disappears later: if there is debt, it can still be negotiated off the price. Requested at the notary's office, the only options left are to take it on or to delay signing.
Status of special levies approved or being voted on
Beyond the certificate of debts, it is worth expressly requesting information on special levies that have been approved but not yet collected and on proposed works on the agenda for the next meeting. This information does not usually appear in the standard certificate because, technically, it is not a debt: it is a future commitment. It has to be requested by name. A full refurbishment that has been discussed but not yet voted on will not appear in any document, and yet it is exactly the kind of information that should be on the table before the price is set.
The documents most frequently missing and why they matter
Of the entire protocol, four documents account for most of the gaps in Madrid's prime segment. This is no coincidence: they are the ones that required active handling by someone who, at the time, had no incentive to do it.
The first are the licences for the last full renovation. The pattern repeats itself: the owner commissioned the renovation from an interior designer, the work was carried out with good aesthetic judgement, and nobody applied for the licence because "it was an interior renovation". In protected buildings, however, what is considered work on communal elements or on the appearance of the building may require a licence even if nobody has touched the façade. The absence of a licence on a renovation costing €200,000 to €400,000 is a real risk of a later demand for legalisation, with the cost of the project, fees and possible reinstatement works borne by the new owner.
The second is the ITE in historic buildings. In Madrid the threshold is fifty years of age, which in the Barrio de Salamanca, Almagro or historic Chamberí covers practically the entire building stock. It is surprising how often the seller does not have the document, does not know whether the building has passed it or does not distinguish between having passed it and having passed it with a favourable result.
The third are minutes containing a special levy resolution that nobody mentions. The levy exists, it has been approved, the seller knows about it and it is not part of the conversation. A buyer who does not ask for the minutes only finds out when the property manager sends the first bill, by which time they are already the owner.
The fourth is the energy performance certificate. It has been mandatory since 2013, but in properties that have not changed hands for years it is common for it to have expired or not to exist at all. It is the seller's responsibility to obtain it, and it should be demanded before the deposit contract rather than assuming it will arrive in time for the deed. Each of these gaps also has its own legal consequences, which are the subject of the most common legal problems when this documentation is missing or arrives late.
What to do when the seller does not hand over a document
The useful answer is not "don't sign until you have everything", which ignores how a market with scarce supply works, nor "don't worry, it will arrive", which is how deposits are lost. There are three calibrated ways out, and choosing between them depends on which document is missing and why.
The first is a condition precedent in the deposit contract. If signing cannot wait but a document from the first group is missing, the buyer can sign with a clause stating that, if the seller does not deliver that document within a set period, the transaction lapses and the deposit is returned without penalty. The clause must be drafted with enforceable precision: exactly which document, issued by whom, with what minimum content, within what period and with what consequence. Wording such as "on satisfactory terms" is not drafting; it is a gap through which the entire protection escapes.
The second is retaining part of the price at the notary's office. When there is a registry encumbrance pending cancellation or an amount in dispute with the community, the notary can withhold an amount from the deed to cover that contingency until it is resolved. It requires the express agreement of the parties and is set out in the deed itself, so it is a solution for the final stage, not for the time of the deposit contract.
The third is to delay signing until the document is available. It is the simplest option and the one most often dismissed under the pressure of the timetable, although in transactions involving high-value homes in Madrid the cost of waiting two weeks rarely bears any relation to the cost of getting it wrong.
That leaves the case in which it is advisable to walk away, and it has a fairly clear profile: when the absence of an essential document coincides with the seller's refusal to accept the corresponding condition precedent. Each of the two on its own can be explained. Together, they are the clearest sign that there is something the seller would rather the buyer did not check before signing.
The architectural perspective: the documents with the greatest technical implications
Three documents in the protocol are read in substantially different ways depending on who has them in front of them. An administrator checks that they exist; a lawyer, that they are valid; an architect, what they say about the building and how much what they say is going to cost.
Building licences are the clearest case. They are not just administrative documents: they are the record of which works have been subject to technical control. A licensed renovation is backed by a project, an architect directing the works and a certificate of completion signed by someone who takes responsibility for what was done. Unlicensed work is not. The difference is not bureaucratic: it is the gap between knowing that someone checked the structural solution for knocking down partition walls or the route of a concealed installation, and not knowing. In a protected building in the Barrio de Salamanca, where the work may have affected listed joinery, mouldings or openings, that gap is measured in tens of thousands of euros of regularisation costs.
The ITE is the second: a technical document signed by an architect or building surveyor that assesses the structure, façades, roofs and communal installations. Reading it properly is not about looking for the word "favourable", but about understanding which area is affected, what deadline the corrective measures have and how much they cost to carry out. An unfavourable result on the structure of a building in Salamanca and an unfavourable result on the façade of a building in Chamartín look alike on paper and are nothing alike on the spreadsheet.
The third is the planning enquiry. The level of protection and permitted uses are details an architect interprets immediately and that determine which project is viable and which will never leave the drawing board. The same applies to the documentation for the private gated communities in the north of Madrid, where the statutes of the community of owners are joined by those of the development itself: plot boundary walls, heights, façade materials, services included in the fees and debts to the development that are separate from those to the home's community of owners. They are design constraints before they are clauses, and it is worth knowing about them while the price is still being negotiated.
Placing this protocol within the complete process of buying a home in Madrid helps to explain why timing matters so much: all this verification belongs to the transition between selecting the property and signing the deposit contract, and that window is narrower than it seems when you are in it.
The document protocol prior to the deposit contract is neither bureaucracy nor excessive caution. It is the only window in the process in which the buyer retains full room for manoeuvre. Before signing, each missing document is a price argument or a condition of the transaction. After signing, the same missing document is an uncertainty taken on with the deposit already committed and the negotiating position surrendered. The difference between the two is a few days' advance planning and a few questions asked in writing. Three questions that this overview has only been able to touch on remain open, to be developed separately: what happens when an encumbrance is not cancelled within the expected period, how to draft a condition precedent that is genuinely enforceable, and what a deposit contract should contain beyond the list of documents that accompany it.
